This project involves the detailed planning and tender preparation for the following construction project: "BAA29915 Föderlach; Construction of an underpass at km 155.140 and the establishment of alternative routes at km 154.764 and km 155.786". The project includes the establishment of an alternati
Contract awarded. Originally published 1 years ago.
No single supplier dominates the field.
In engineering, BBINFRASTRUKTUR AG has awarded 5 contracts to 5 suppliers.
Across engineering, the most active winners are AECOM LTD, WSP UK LIMITED, OVE ARUP PARTNERS LIMITED — the field to beat, or your route in as a partner.
This contract involves the construction of overhead line systems as part of the re-electrification of the railway line from Wiener Neustadt to Loipersbach-Schattendorf. Suppliers are invited to provide services related to the installation of overhead electrical lines along the entire route. The proj
This contract involves the construction of two bridge structures on the Inner West Railway at kilometers 23.655 and 26.058. Suppliers are invited to submit proposals for the construction work, which is part of the infrastructure development by ÖBB-Infrastruktur AG. The project aims to enhance transp
This contract involves the oversight of the construction and renewal of two bridge structures (BR06 and BR07) as part of maintenance measures for the ÖBB railway line Feldkirch (AT) - Buchs (CH). The bridges are located over the Werdenberger Binnenkanal and the Flutbrücke. Construction is set to beg
This contract involves construction work for the establishment of an underpass at kilometer 155.140, as well as the closure of railway crossings at kilometers 154.764 and 155.786. Key tasks include the construction of a new underpass, rerouting of Föderlacher Straße as a compensatory measure, and th
Establish a strategic partnership framework with 2 suppliers to deliver specialized expertise, independent assurance, and innovation in support of major programmes and operational excellence.
Arboricultural survey needed at Woodside Day Centre on White Hart Lane to assess tree health, safety, and maintenance requirements.
Conduct an arboricultural survey to evaluate trees and vegetation at Queen Street/Bull Lane Playing Field in N17 as part of the London Construction Programme.
Professional services required to deliver a 13-month integrated catchment management and community engagement project combining environmental assessments, education, citizen science monitoring, and habitat restoration in Carndonagh, Co. Donegal.