The City of Gelsenkirchen is seeking suppliers to provide assessment services for the renovation needs of non-residential buildings, following the DIN V 18599 standard. This contract includes three lots: Lot 1 for the central area, Lot 2 for the northern area, and Lot 3 for the southern, western, an
Contract awarded. Originally published 7 months ago.
Only 1 prior award here — too little to read.
In engineering, CITY OF GELSENKIRCHEN has awarded 1 contract to 1 supplier.
Across engineering, the most active winners are AECOM LTD, WSP UK LIMITED, OVE ARUP PARTNERS LIMITED — the field to beat, or your route in as a partner.
The City of Gelsenkirchen is seeking suppliers to conduct periodic inspections of electrical equipment in accordance with DIN EN 50699 (VDE 0702):2021-06. This includes the inventory of electrical operating resources across various districts: District Center, District North, District West, District
The City of Gelsenkirchen is seeking suppliers for the construction of heating systems and central water heating systems as part of the IGA 2027 project. This project includes the development of the Future Island with Nordsternpark+, as well as the entrance and administrative building located at Gro
The City of Gelsenkirchen is seeking suppliers for the installation of a lightning protection and grounding system at the IGA 2027 Zukunftsinsel project, which includes the Nordsternpark and the entrance and administrative building located at Grothusstraße 203, 45883 Gelsenkirchen. The total value o
The City of Gelsenkirchen is seeking suppliers to provide scaffolding services for the construction of a coal bunker facility, including parts A and C of the building located at Grothusstraße 205, 45883 Gelsenkirchen. This contract involves the installation and maintenance of scaffolding necessary f
KCHFT seeks specialist boiler and mechanical contractors for planned remedial works, replacements, and installations across its South East estate on an activity-based contract.
Main Contractor needed to complete fit-out works for a new Apollo Mission Simulator Gallery space.
Design, manufacture, install, and commission a replacement vertical lifting platform for Bonington Gallery.
Tier 1 Network Rail contractors sought to remove and replace the Boars Head Footbridge structure and renew foundations over the West Coast Mainline railway in Wigan.