This project aims to enhance the technical condition and traffic safety of the affected roads and intersections through pavement renovations, necessary widenings, intersection developments, and related drainage, traffic engineering, and structural interventions. The procedure consists of the followi
Tender closed on 3 Mar 2026. Awaiting award.
Add BidSonar to the assistant you already use, then ask it about this notice in plain English.
BidSonar is free · sign in once
The contracting authority is seeking to establish framework agreements for ice removal and snow clearing services on public roads managed by Magyar Közút Nonprofit Zrt. This procurement process will result in 14 separate contracts for the rental of equipment necessary for these services, including s
To optimize its operations, the contracting authority seeks to address its maintenance equipment needs through a rental agreement that includes comprehensive maintenance services. They intend to establish a mixed rental framework agreement with a net budget of 180,000,000 HUF for a duration of 12 mo
This contract involves the procurement of a small ferry boat for transporting vehicles, as well as the provision of a substitute small ferry boat under a leasing arrangement. Suppliers are invited to submit bids for the supply of these vessels, which are essential for ferry services in the Csongrád
This contract opportunity involves the preparation of drafts related to the creation and review of technical regulations for road construction, as detailed in the procurement documents. The Hungarian Public Road Nonprofit Limited Company (Magyar Közút NZrt.) is authorized to issue orders up to a net
Worcester City Council seeks an experienced contractor for a 12-week refurbishment of Barrington House, with mandatory site visit attendance required before tender submission.
Southend-on-Sea City Council seeks contractors to design and build a specialist resource base for pupils with EHCPs at Earls Hall Primary School.
National Oceanography Centre seeks suppliers of reverse osmosis units and water purification equipment for research and operational use.
Integrated supply team sought to deliver new 730-pupil post-primary school with enabling works and demolition at St Conor's College in Kilrea.