    ContractsConstruction of Irrigation System in Lukač
    Closed contract

    Construction of Irrigation System in Lukač

    Contract value
    €9m
    Closed 6 Mar 2026

    This project involves the construction of an irrigation system covering an area of 447 hectares in the Virovitičko-podravska County, specifically in the Municipality of Lukač. The irrigation system will connect users to the public irrigation system of Lukač. Key components of the project include: -

    🇭🇷CroatiaPublished 24 Feb 2026· 5 months agoviaTED
    Contract value
    €9m
    Closed 6 Mar 2026
    Tender deadline passed on 6 Mar 2026.

    Decision brief

    4 fields
    • Contract value
      est.€9,000,000
      Euros
    • Tender closed
      6 Mar 2026
      5 months ago
    • Sector
      Construction
      Browse related listings
    • Location
      🇭🇷Croatia

    Lifecycle

    Closed

    Tender closed on 6 Mar 2026. Awaiting award.

    24 Feb 2026Today6 Mar 2026

    Brief

    This project involves the construction of an irrigation system covering an area of 447 hectares in the Virovitičko-podravska County, specifically in the Municipality of Lukač. The irrigation system will connect users to the public irrigation system of Lukač. Key components of the project include: - A flood protection structure around the water intake facility on the Drava River. - Water intake from the Drava River. - A pumping station with associated facilities. - A network of pressurized distribution pipelines with control valves and connections for irrigation. Water for irrigation will be sourced directly from the Drava River, particularly during the growing season (April to September) when water availability is highest. Monthly irrigation requirements have been calculated based on crop types, with a focus on the most demanding crops such as tomatoes and peppers. The system is designed to handle a maximum capacity of 290 liters per second. The water intake structure will house low-pressure pumps with a total capacity of 300 liters per second and a lift height of 13 meters. A 500 mm diameter inlet pipeline will connect the water intake to a settling basin, which has a working volume of 140 m³ for sedimentation of suspended particles. Water will overflow from the settling basin into a compensation basin, which will store water to ensure the pumps remain submerged and operate efficiently. The compensation basin has a working volume of 250 m³ and can discharge water back into the Drava River. The pumping station, located next to the compensation basin, will ensure a minimum working pressure of 5.5 bar in the distribution system. Access to the site will be provided via a 6.5 m wide gravel road, totaling 770 m in length. Water will be distributed to end users through a network of pressurized pipelines totaling 16,781 m, with 38 control and shut-off valves and 218 connections for irrigation equipment. The operation of the water intake and pumping station will be managed through a control system. The connection of the irrigation system to the electrical grid will be carried out according to the optimal technical solution report and the electrical project. The connection will have a capacity of 520 kW to the HEP-ODS network, and the construction of the connecting power line and transformer station is included in this project.

    More from VIROVITICAPODRAVINA COUNTY

    1 listingView all →
    Construction🇭🇷Croatia

    Construction of a New Primary School in Pitomača

    This contract involves the construction of a new primary school building, which will include a three-part sports hall and other accompanying facilities, covering a total net area of 5,178.63 m². The construction site is located in the Virovitica-Podravina County, specifically in Pitomača, on a newly

    est.€9,445,000VIROVITICAPODRAVINA COUNTY
    Published 14 May 2025

    Open in Construction

    4 open listingsView all →
    Construction🇮🇪Ireland

    Marine Navigation Aids Services for Donegal Bay

    Supply, installation, and servicing of navigation buoys and associated marine equipment in Donegal Bay, including removal of existing systems and deployment of new 1.2-meter diameter buoys.

    Donegal County Council
    Published 21 Aug 2026
    Construction🇮🇪Ireland

    Sash Window Refurbishment and Repair - Moyderwell Building, Tralee

    Refurbishment and repair services required for sash windows at the Moyderwell building in Tralee, County Kerry.

    est.€200,000KERRY EDUCATION AND TRAINING BOARD
    Published 21 Aug 2026
    OpenConstruction🇬🇧United Kingdom

    Community Hub and Toilet Facilities Refurbishment and Construction Project

    Padstow Town Council invites expressions of interest from contractors for refurbishment of Community Hub roof and two toilet blocks, plus construction of new toilet facilities at Lawn's car park, with works scheduled for Q4 2026.

    PADSTOW TOWN COUNCIL
    Published 21 Aug 2026
    Construction🇬🇧United Kingdom

    Rosary Road Home Refurbishment and Extension in Oldham

    Refurbishment and single storey extension project for a residential home located on Rosary Road in Oldham.

    est.£250,000Oldham Metropolitan Borough Council
    Published 21 Aug 2026
    Take action
    View on sourceTED

    Original closed notice on the publisher's site

    Publisher
    Publications Office of the European Union
    Licence
    EU 2011/833/EU + TED reuse notice
    Source
    ted.europa.eu
    Record ID
    131267-2026
    VC
    Buyer
    VIROVITICAPODRAVINA COUNTY
    Sector
    Construction