This contract involves engineering services for the renovation of fish passage at the Höngg hydropower plant in Zurich, Switzerland. The project is part of a comprehensive effort to restore hydropower in compliance with the Swiss Water Protection Act. The project is divided into two main parts: the
Contract awarded. Originally published 7 months ago.
No single supplier dominates the field.
In engineering, DIB ELECTRICITY WORKS OF THE CITY OF ZURICH EWZ has awarded 6 contracts to 6 suppliers.
Across engineering, the most active winners are AECOM LTD, WSP UK LIMITED, OVE ARUP PARTNERS LIMITED — the field to beat, or your route in as a partner.
The General Planner for House Connections (GP HAS) is responsible for the planning and implementation of house connections (HAS). This includes project management and HVAC engineering services, including MSRL. Each house connection will be divided into SIA phases 32-53.
This contract opportunity involves pipeline construction work for neighborhood development. The work includes the construction of chamber structures, main pipelines, distribution pipelines, and house connection lines as part of the "Cool City" heating network. Suppliers are invited to submit their b
The contract involves planning and implementing pipeline systems for district heating and cooling in downtown Zürich. The selected contractor will be responsible for designing the pipelines up to the interior walls of customer buildings. Each sub-project will be divided into phases according to SIA
The project involves planning and executing underground construction services for district heating and cooling systems, as well as energy systems. Specifically, it includes the design and implementation of microtunnels in Lot 2. Each subproject and section of the district lines will be divided into
The University of Birmingham is inviting expressions of interest from contractors to design, install and operate an integrated EV charging infrastructure and managed service across its campus under one of several proposed commercial models.
Cefas invites suppliers to attend market engagement sessions to provide feedback on a planned statutory shellfish E. coli monitoring service for Shetland and Orkney, with formal procurement to follow.
Consultant needed to guide Harrogate's Neighbourhood Development Plan from public consultation through to final referendum.
GCA seeks a cloud-based energy portfolio management system to manage approximately 1.2 million meters and sites for public sector energy purchasing, with a 3-month trial period leading to potential contract award.