This contract involves the supply of construction infrastructure and technical equipment for use in Valladolid during scheduled activities by the Municipal Culture Foundation. It includes the assembly, disassembly, loading, unloading, and transportation of the supplies.
Contract awarded. Originally published 6 months ago.
No single supplier dominates the field.
In construction, PRESIDENCY OF THE MUNICIPAL FOUNDATION OF CULTURE has awarded 4 contracts to 2 suppliers.
Across construction, the most active winners are SPECIALIST COMPUTER CENTRES PLC, PORTAKABIN LIMITED, Allerton Damp Proofing Limited — the field to beat, or your route in as a partner.
The Presidencia de la Fundación Municipal de Cultura is seeking suppliers to provide technical assistance services for stage setups at various shows and events held at the Teatro Calderón in Valladolid. This contract, valued at approximately €1,936,545.74, aims to ensure high-quality technical suppo
This contract involves the supply of construction infrastructure and technical equipment for use in Valladolid during scheduled activities by the Municipal Culture Foundation. It includes the assembly, disassembly, loading, unloading, and transportation of the supplies.
The Valladolid Science Museum, part of the Municipal Culture Foundation, aims to enhance public understanding of science and technology. The current permanent exhibition room, 'Energy', is outdated, with most systems and equipment no longer supported. This contract seeks to renovate a 338 m2 area in
North Hertfordshire District Council is procuring a development partner to lead the feasibility, planning, and delivery phases of the strategic Churchgate Regeneration Zone project in Hitchin town centre.
Stotfold Town Council seeks experienced contractors to renovate the cemetery toilet block, adding compliant facilities, solar heating, and storage within a £190,000-£210,000 budget.
Construction of an adapted ground floor cloakroom and WC facility for a vulnerable tenant at a Blyth residential property, scheduled to begin November 2026 over 14 weeks.
Design-and-build glazed envelope and structural steelwork renewal for the Grade II listed Barbican Arts Centre, including new glazing systems, steel framing, and façade access solutions across multiple building sections.