This contract involves the construction of four separate cogeneration sources using gas engines with installed capacities of 2x3.1-3.3 MWe and 2x4.3-4.5 MWe, powered by type E natural gas. Additionally, it includes the adaptation of the electrical switchgear at the Ostrowski Heating Plant and the ex
Tender closed on 10 Mar 2026. Awaiting award.
Gwynedd Council seeks suppliers to design, supply, and install grid-connected solar PV systems across 11 properties.
City College Plymouth is tendering for reliable electricity and gas suppliers to serve their multi-site campus with competitive pricing and strong sustainability commitment.
Install a 99kW rooftop solar panel system on the West Ham shop with inverters and electrical connections to the stadium network.
Galway County Council seeks a framework supplier for the design, installation, and maintenance of rooftop solar PV systems across their facilities.