JGC Engineering and Technical Services has been contracted by NRS Dounreay to manufacture specialized equipment for the M2 Adaptor Frame in support of nuclear facility decommissioning operations.
Contract awarded. Originally published 2 days ago.
No single supplier dominates the field.
In construction, NUCLEAR RESTORATION SERVICES has awarded 16 contracts to 14 suppliers.
+8 more suppliers
Across construction, the most active winners are HOLCIM UK LIMITED, LINDUM GROUP LIMITED, TARMAC TRADING LIMITED — the field to beat, or your route in as a partner.
Supply and maintain Microsoft Teams-enabled audiovisual meeting equipment to replace legacy systems in emergency planning facilities.
General facility repairs at LC28 including structural work, hazardous material handling, and pathway improvements across multiple industrial buildings and infrastructure.
Chapelcross Site is seeking contractors for roof refurbishment work covering three areas of their facility.
Supply and installation of a wireless fire detection system for the R2 ponds complex at Hinkley Point A nuclear facility.
Convert an existing classroom into an accessible special needs learning environment with dedicated outdoor play spaces at Scoil Bhride Lackagh.
Main contractor required to design and build 32 affordable residential units at Brunton Wharf Estate with enhanced amenities and security upgrades under Building Safety Act compliance.
Roofing repair and maintenance services required for the stairwell and lift areas at Main Square Car Park in Camberley.
Crescent Court requires structural repairs to lintels and balconies to restore safety and building integrity.